Competition Plan

Copies of all documents constituting the Allegheny County Airport Authority's Competition Plan for Pittsburgh International Airport are available from the Authority administrative offices at the Airport upon request. The Authority may charge a nominal fee for copies of documents.

Latest Postings:

ALLEGHENY COUNTY AIRPORT AUTHORITY
PROJECT NUMBER 39M1-09
2010 AIRPORT PREVENTATIVE MAINTENANCE PROJECT
ABOVE GROUND PUMP HOUSE DIESEL FUEL STORAGE TANK UPGRADE
AT
PITTSBURGH INTERNATIONAL AIRPORT


The work to be done under this contract includes the furnishing of all labor, materials, equipment, tools and all associated work for:

Project No. 39M1-09       ABOVE GROUND PUMP HOUSE DIESEL FUEL -- STORAGE TANK UPGRADE
Full PDF with Details

The work generally includes but is not necessarily limited to the following:
 

  • Construction of three (3) reinforced concrete support pads for the new diesel fuel storage tanks.
  • Provision and installation of three 93) UL-2085 Diesel Fuel Storage Tanks of 250-gallons each with required NFPA accessories and other features specified.
  • Provision and installation of three (3) UL-142 Diesel Fuel Day Tanks of 10-gallons each with required NFPA accessories and other features specified.
  • Provision and installation of electrical grounding systems for the Diesel Fuel Tanks.
  • Provision and installation of fuel lines, pump valves, etc. as shown on the drawings and described in the Technical Specifications.
  • Provision and installation of four (4) pipe bollards as detailed and as located on drawings.

"This description is by no means a complete and total description of all work items in this project and is for general informational purposes only. The Contract drawings and specifications indicate the full extent of the work to be performed under this Contract. Should there be any discrepancies between this Document 00050 DESCRIPTION OF WORK and the Contract Drawings and Specifications the Contract Drawings and Specifications shall prevail." 


ALLEGHENY COUNTY AIRPORT AUTHORITY
PROJECT 12G1-10 (GENERAL)
SITE 8.3 INDUSTRY DRIVE SANITARY SEWER EXTENSION
AT
PITTSBURGH INTERNATIONAL AIRPORT


The work to be done under this contract includes the furnishing of all labor, materials, equipment, tools and all associated work for:

Project No. 12G1-10       SITE 8.3 INDUSTRY DRIVE -- SANITARY SEWER EXTENSION
Full PDF with Details

The work generally includes but is not necessarily limited to the following:
 

  • Construction of 800 linear feet of 8” sanitary sewer, four manholes and the connection to the sanitary sewer manhole.
  • The proposed sanitary crosses an existing stream ri[ rap area. A tempory road crossing of the stream rip-rap area is to be constructed for use by construction traffic.
  • The construction is not to impact the wetlands

"This description is by no means a complete and total description of all work items in this project and is for general informational purposes only. The Contract drawings and specifications indicate the full extent of the work to be performed under this Contract. Should there be any discrepancies between this Document 00050 DESCRIPTION OF WORK and the Contract Drawings and Specifications the Contract Drawings and Specifications shall prevail." 


ALLEGHENY COUNTY AIRPORT AUTHORITY
PROJECT NUMBER 53G2-10
LANDSIDE TERMINAL CONCRETE REPAIR AND SEALANT COATING PROJECT
AT
PITTSBURGH INTERNATIONAL AIRPORT


The work to be done under this contract includes the furnishing of all labor, materials, equipment, tools and all associated work for :

Project No. 53G2-10       LANDSIDE TERMINAL CONCRETE REPAIR AND SEALANT COATING PROJECT
Full PDF with Details

The work generally includes but is not necessarily limited to the following:
 

  • The repair of contract identified concrete, expansion joint, and sealant locations and other locations within the work area as identified by the Owner’s Representative.
  • Cleaning and coating of the precast concrete on the terminal building generally under the ticketing level on both the West and East building faces.

"This description is by no means a complete and total description of all work items in this project and is for general informational purposes only. The Contract drawings and specifications indicate the full extent of the work to be performed under this Contract. Should there be any discrepancies between this Document 00050 DESCRIPTION OF WORK and the Contract Drawings and Specifications the Contract Drawings and Specifications shall prevail." 


ALLEGHENY COUNTY AIRPORT AUTHORITY
PROJECT NUMBER 8G1-10
2010 JOINT SEALING AND CRACK REPAIR PROJECT
AT
PITTSBURGH INTERNATIONAL AIRPORT


The work to be done under this contract includes the furnishing of all labor, materials, equipment, tools and all associated work for the following projects as shown on the Contract Drawings.

Project No. 8G1-10       2010 Airfield Joint Sealing and Crack Repair Project
Full PDF with Details

The work generally includes but is not necessarily limited to the following:
 

  • Isolated slab replacement, crack and spall repair, and joint sealing on Runway 10R-28L; and
  • Replacement of airfield lighting impacted by isolated slab replacements.

"This description is by no means a complete and total description of all work items in this project and is for general informational purposes only. The Contract drawings and specifications indicate the full extent of the work to be performed under this Contract. Should there be any discrepancies between this Document 00050 DESCRIPTION OF WORK and the Contract Drawings and Specifications the Contract Drawings and Specifications shall prevail."